Current and Upcoming Projects:

10/5/00 had massive stump at bottom of driveway cut down. Two stumps will require stump grinding. Estimate was $3-400
10/7/00
Replaced all flourencent lights in kitchen. Bought water heater blanket.
10/8/00 Scrapped and primered all bare wood areas on exterior. Will look patchy but it will protect it for the winter.
10/9/00 Bulldozed areas reseeded and peat mossed.
10/10/00

Had the roof repaired again. The leak in one of the upstairs bedroom was not repaired and a river of water came in when we had an inch of rain the other day. Apparantly it was a gutter problem. Pitch was also put in the front Dormer window frame.

Painted most of the previous primered areas. Had another color matched. It is a dark grey on the windows. Paint I had matched months ago blended perfectly.

Front yard lamp post now fully operational. Still needs refinishing and welding.

   

Upcoming:

Finish lower driveway jungle area. Still looks bad with stumps.
Take bicycles from basement to dump and install water heater blanket
Remove old swing and give away if possible
Have Vicky chainsaw old discarded cherry tree limbs behind old swing
Work on barbeque area.
  Pressure wash or scrub exterior as its very dirty and mossy in areas.
Primer and Paint porch floor (scrapped already)

 

The Bomb being loaded up for another Dump Run.